Prep for Module 1 | Practice Operations

Factory Flow

Learn Production Routing & Sequencing

Products Flow Through Stations

In Module 1, you'll manage a production floor where products move from station to station. Different products take different routes. Your job? Get orders completed as fast as possible.

✂️
Cutting
🧵
Sewing
🔥
Press
📦
Packaging

🎯 The Challenge

Each product has a route (which stations it needs) and a cycle time at each station. Drag orders onto the production floor and watch them flow. Can you beat the target time?

Completed
0
Total Time
0s
Target
120s
Round 1/4
📋 Orders to Produce
Drag orders to start production
🏭 Production Floor
0s
Rounds Beaten
0
out of 4

🔧 Module 1 Production Tips

  • Priority matters: You control which order gets processed first at each station
  • Routes vary: Not all products need Press Transfer — check the routing!
  • Watch for bottlenecks: If products pile up at Sewing, that's your constraint
  • Cycle time adds up: Faster stations still wait for slower ones to finish
🏆

Target Beaten!

Your Time
85s
Target
100s